Project context
Maintenance traffic had degraded the existing system, with worn finishes and weak detailing creating water-ingress risk. Intrusive tender-stage surveys established the actual build-up.







Project overview
Maintenance traffic had degraded the existing system, with worn finishes and weak detailing creating water-ingress risk. Intrusive tender-stage surveys established the actual build-up.
Existing insulation was removed to the retained waterproofing layer before a fully bonded Bauderflex system with 220mm PIR was installed, achieving 0.11 W/m²K.
Live plant remained in place. New insulated upstands, parapets, copings, outlets and contrasting maintenance walkways were sequenced around services.
Delivered within programme, the roof is robust, compliant and thermally upgraded, with improved drainage and safe access.
Start a conversation
Engage Thornton early for coordinated technical and commercial input—before critical interfaces become site problems.