The Edge PBSA

Completed2024
SectorStudent Accommodation
Main contractorTurkington Construction
LocationBelfast, Northern Ireland

Project overview

An eleven-storey city-centre façade, roof and access package delivered from early contractor involvement through Stage 5 design and installation.

01

Project context

The Edge forms a prominent frontage beside Ulster University. Thornton joined during ECI before assuming full Contractor Design Portion responsibility.

The package included fibre-cement rainscreen, Kalzip high-level cladding, built-up felt and podium waterproofing, soffits, louvres, davit arms, fall arrest and cavity barriers.

02

Technical delivery

Early surveys found the superstructure outside tolerance. Bracketry and supports were redesigned to absorb the variance while retaining true external lines.

Fire-engineer coordination, EWS1 traceability, height-limited access, minimal storage and an occupied neighbour demanded just-in-time delivery, mast-climber planning and bespoke scaffold.

03

Performance outcome

The envelope meets fire, thermal and weathering requirements, with sectional handovers and digital QA maintaining progress and full installation traceability.

“Thornton played an integral role in developing, supporting and adjusting the variables on a complex city-centre project, while ultimately delivering the target completion date.”

Shaun DonnellyContracts Manager, Turkington Construction

Start a conversation

Bring certainty to the envelope.

Engage Thornton early for coordinated technical and commercial input—before critical interfaces become site problems.

This independent concept routes enquiries through Thornton’s official public channels.